# Dependency Graph Patterns
|
||||
|
||||
Visual patterns for task dependency design with trade-offs.
|
||||
|
||||
## Pattern 1: Fully Independent (Maximum Parallelism)
|
||||
|
||||
```
|
||||
Task A ─┐
|
||||
Task B ─┼─→ Final Integration
|
||||
Task C ─┘
|
||||
```
|
||||
|
||||
- **Parallelism**: Maximum — all tasks run simultaneously
|
||||
- **Risk**: Integration may reveal incompatibilities late
|
||||
- **Use when**: Tasks operate on completely separate files/modules
|
||||
- **TaskCreate**: No blockedBy relationships; integration task blocked by all
|
||||
|
||||
## Pattern 2: Sequential Chain (No Parallelism)
|
||||
|
||||
```
|
||||
Task A → Task B → Task C → Task D
|
||||
```
|
||||
|
||||
- **Parallelism**: None — each task waits for the previous
|
||||
- **Risk**: Bottleneck at each step; one delay cascades
|
||||
- **Use when**: Each task depends on the output of the previous (avoid if possible)
|
||||
- **TaskCreate**: Each task blockedBy the previous
|
||||
|
||||
## Pattern 3: Diamond (Shared Foundation)
|
||||
|
||||
```
|
||||
┌→ Task B ─┐
|
||||
Task A ──→ ┤ ├→ Task D
|
||||
└→ Task C ─┘
|
||||
```
|
||||
|
||||
- **Parallelism**: B and C run in parallel after A completes
|
||||
- **Risk**: A is a bottleneck; D must wait for both B and C
|
||||
- **Use when**: B and C both need output from A (e.g., shared types)
|
||||
- **TaskCreate**: B and C blockedBy A; D blockedBy B and C
|
||||
|
||||
## Pattern 4: Fork-Join (Phased Parallelism)
|
||||
|
||||
```
|
||||
Phase 1: A1, A2, A3 (parallel)
|
||||
────────────
|
||||
Phase 2: B1, B2 (parallel, after phase 1)
|
||||
────────────
|
||||
Phase 3: C1 (after phase 2)
|
||||
```
|
||||
|
||||
- **Parallelism**: Within each phase, tasks are parallel
|
||||
- **Risk**: Phase boundaries add synchronization delays
|
||||
- **Use when**: Natural phases with dependencies (build → test → deploy)
|
||||
- **TaskCreate**: Phase 2 tasks blockedBy all Phase 1 tasks
|
||||
|
||||
## Pattern 5: Pipeline (Streaming)
|
||||
|
||||
```
|
||||
Task A ──→ Task B ──→ Task C
|
||||
└──→ Task D ──→ Task E
|
||||
```
|
||||
|
||||
- **Parallelism**: Two parallel chains
|
||||
- **Risk**: Chains may diverge in approach
|
||||
- **Use when**: Two independent feature branches from a common starting point
|
||||
- **TaskCreate**: B blockedBy A; D blockedBy A; C blockedBy B; E blockedBy D
|
||||
|
||||
## Anti-Patterns
|
||||
|
||||
### Circular Dependency (Deadlock)
|
||||
|
||||
```
|
||||
Task A → Task B → Task C → Task A ✗ DEADLOCK
|
||||
```
|
||||
|
||||
**Fix**: Extract shared dependency into a separate task that all three depend on.
|
||||
|
||||
### Unnecessary Dependencies
|
||||
|
||||
```
|
||||
Task A → Task B → Task C
|
||||
(where B doesn't actually need A's output)
|
||||
```
|
||||
|
||||
**Fix**: Remove the blockedBy relationship; let B run independently.
|
||||
|
||||
### Star Pattern (Single Bottleneck)
|
||||
|
||||
```
|
||||
┌→ B
|
||||
A → ├→ C → F
|
||||
├→ D
|
||||
└→ E
|
||||
```
|
||||
|
||||
**Fix**: If A is slow, all downstream tasks are delayed. Try to parallelize A's work.
|
||||